Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Alligator Creek Maintenance Dredge
Last Updated: 11/27/2024 Category: Coastal Current Phase: Design Development
Design, permit, dredge, and construction oversight for project certification of a maintenance dredge event of Alligator Creek channel.
Buena Vista Waterways Dredging Project
Last Updated: 11/27/2024 Category: Coastal Current Phase: Construction
The Buena Vista Waterway Committee requested and received a dredging of the access and connector channels in 2016. Since then, new concerns of a need to restore safe navigation have been brought to the County’s attention.
Gulf Cove Interior Canal design and maintenance dredge project
Last Updated: 11/27/2024 Category: Coastal Current Phase: Design Development
Gulf Cove Interior Canal bathymetric survey and design project to -4'MLW. Gulf Cove Waterway MSBU requested work.Last Updated: 11/27/2024 Category: Coastal Current Phase: Design Development
Design, permit, and construct a maintenance dredge event within the Pirate Harbor waterway system. This project will include construction oversight with post dredge bathymetric surveys for project certification. This project is for approximately the landward half of the access channel inland connector canals. The finger canals are not included in this project.South Gulf Cove Parallel Locks Project
Last Updated: 11/27/2024 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Last Updated: 11/26/2024 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.East Port Water Reclamation Facility Expansion
Last Updated: 11/26/2024 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.Last Updated: 11/26/2024 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Lakeview/Midway Wastewater Expansion
Last Updated: 11/26/2024 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service approximately 1,500 properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.